Participate in implementing technical office policies and procedures. Study the project contract documents (time schedule, project design drawings, BOQ etc...) Prepare shop drawing and coordination drawings (or composite drawing) based on project's design drawings inaccurate with quality standard.on. Coordinate with surveying engineer to provide him all the information about land coordinates and any site measurement required. Participate in solving/report any unexpected technical difficulties and other problems that may arise during construction to the Technical Office Manager for discussion and proper solve. Prepare as-built drawings at the end of the project and hand over to the project consultant. The ability to prepare equipment submittals to meet the consultant specifications. Checking the Static and Hydraulic calculation Checking the Design capacity and make sure the load calculation is not according to design capacity
from Wuzzuf All Jobs http://bit.ly/2z2BfdN
No comments:
Post a Comment